![]() This effort will require several major infrastructure projects, including: I-405 overpass (open 2024), Wilburton Trestle rehabilitation (open 2024), NE 8th Street bridge (open 2023). ![]() In north Bellevue 1 mile of gravel trail connnects 120th Ave NE in the Spring District to the Cross Kirkland Corridorįuture Connections: King County will construct a fully connected trail though Bellevue, eventually connecting to the Cross Kirkland Corridor. BellevueĬurrent Status: In November 2021 2.5 miles of new paved Eastrail were opened just south of I-90 along Lake Washington. Current Status: 1.5 miles of gravel trail is currently between Gene Coulon Park and the Seahawk’s Virginia Mason Athletic Center.įuture Connections: A new pedestrian-only connection into Gene Coulon Park and eventual a multi-use trail connection to Southport business area (hotels, The Landing, Boeing).
0 Comments
Leave a Reply. |